Warning: mkdir(): No space left on device in /www/wwwroot/T3.COM/func.php on line 127

Warning: file_put_contents(./cachefile_yuan/tongxin668.com/cache/61/42f9b/1b11b.html): failed to open stream: No such file or directory in /www/wwwroot/T3.COM/func.php on line 115
Common problem-Foshan Huihong Plastic Industrial Co.,Ltd.




          91麻豆精品传媒国产,麻豆免费版免费下载,麻豆手机在线观看,无码人妻丰满熟妇区毛片蜜桃麻豆

          Functional Packaging Leader

          Monday to Saturday8:00-18:00

          0757-8116 2395

          Your position:Customer service - Common problem

          Free service hotline:

          0757-8116 2395

          Fax:0757-8116 2399

          Add:No.2, Kewang Road, zone a, science and Technology Industrial Park, Shishan town, Nanhai District, Foshan City, Guangdong Province

          E-mail:huihong@tongxin668.com

          Common problem

          When the product is just turned on, the product runs away. The reasons for the lack of glue after a

          Announcer:Huihong   Addtime:2020-02-18

          Solution: The melt in the injection tube of the injection molding machine has a long heating time, low melt viscosity, and good fluidity when the machine is just turned on. The product is easy to run, and after a period of production, the melt continuously removes the heat, causing the melt. Insufficient, high viscosity, poor fluidity, making the product lack of glue.

          After a period of production, gradually increase the temperature of the tube to solve.

          Related news

          2thKewang Rd.,Shishan Industrial Park Area A,Nanhai District,Foshan,Guangdong,China Post Code 528200

          +86-757-81162396 81162395

          huihong@tongxin668.com

          Follow us

          Copyright © 2020 Foshan Huihong Plastic Mould Co., Ltd. All Rights Reserved. Technical Support:ceall.net.cn

          網站地圖